SOP: DTI SH85/86 Jointfiler Application
Standard Operating Procedure for using DTI SH85/86 Jointfiler to fill and repair cracks in concrete floors, including preparation, filling, leveling, and cure time requirements.
Product
DTI SH85/86 Jointfiler
Document Type
Standard Operating Procedure
Dwell Time
15 Minutes
Cure Time
3 Hours (no foot traffic)
Application Procedure
- Clean the crack. Use a stiff brush to remove any debris from the crack before applying any product.
- Insert the joint filler. Use the Dual Cartridge Gun with SH85 Joint Fill to insert the filler into the crack.
- Level the filler. Level the filler so it sits flush with the surrounding concrete surface.
- Trim excess material. After 15 minutes, allow the material to sit, then use a trowel or shaving tool to remove any excess.
- Secure the area. Block off the treated area from all foot traffic for at least 3 hours to allow the product to fully cure.
Equipment and Materials
- Stiff brush (for crack preparation)
- Dual Cartridge Gun
- DTI SH85 Joint Fill cartridge
- Trowel or shaving tool
- Perimeter barriers / caution tape