Skip to main content
    Industrial & Commercial Floor Repair, Northern California

    Your floor is down.
    We put it back in service
    in 24 hours.

    Spalled joints, forklift damage, failed coatings, cracked slabs. DTI's self-performing crews repair, coat, and reopen industrial floors across the Central Valley, Bay Area, and Sacramento, without shutting down your operation.Repair damaged concrete floors, cracked slabs, joints, spalls and failed coatings with expert resurfacing, overlays and epoxy solutions

    Licensed CA #1003639Self-performing crews, no subsSite walk within 48 hoursSince 2016

    Request a Site Walk

    Tell us what failed and where. A project manager reviews every request within one business day and calls you back.Our project manager will get back to you shortly.

    By submitting, you agree DTI may contact you about this request. See our Privacy Policy.

    Floor out of service right now? Emergency line (209) 637-9802

    2,000+Projects completed
    25+Industries served
    24 hrReturn to traffic, most systems
    48 hrSite walk turnaround
    What we repair

    Built for floors that carry the business

    Every crew on your site is a DTI employee. One provider, one scope, one point of accountability from surface prep through the last coat.

    Joint, Crack & Spall Repair

    Control joints beaten out by forklift traffic, cracks that catch pallet jacks, spalled edges at dock doors.

    • Semi-rigid polyurea and epoxy joint fill
    • Structural crack injection
    • Rapid-set spall patching, traffic in hours

    Epoxy & Urethane Cement Systems

    Failed, peeling, or worn coatings replaced with systems matched to your chemical, thermal, and traffic loads.

    • Urethane cement for food, beverage, and wash-down areas
    • High-build epoxy for manufacturing and warehousing
    • ESD and chemical-resistant options

    Overlays & Slab Restoration

    When the slab itself is the problem: delamination, dusting, moisture, or a surface that no coating will hold on.

    • Cementitious overlays and self-levelers
    • Moisture vapor mitigation
    • Grinding and polished concrete restoration
    How it works

    Spec first, price second

    A floor repair that fails in six months costs more than the one done right. We diagnose before we quote.

    01

    Call or send the form

    A project manager, not a call center, reviews your request within one business day.

    02

    Site walk in 48 hours

    We test the slab, check moisture and profile, and map the damage so the fix matches the cause.

    03

    Written spec and schedule

    System, prep method, cure times, and a phased plan that keeps the rest of your floor working.

    04

    Repair and reopen

    Self-performing crews, nights and weekends available. Most systems return to foot traffic in 24 hours.

    Recent work

    Floors we have put back to work

    Systems specified toOSHAADAASTMNSFFDA / USDAHACCPESD S20.20cGMP
    Who we work for

    Facilities that cannot afford downtime

    Warehousing & DistributionFood & Beverage ProcessingManufacturingPharmaceutical & CleanroomAutomotive & FleetData CentersRetail & GroceryGovernment & MilitaryCommercial Kitchens
    Service area

    Based in Tracy. Serving nationwide.

    DTI serves industrial and commercial facilities across Northern California and nationwide, including multi-site clients. Project schedules are coordinated around your scope, site access, and operating windows.

    TracyStocktonModestoSacramentoLivermoreFremontSan JoseOaklandFresnoMercedLathropManteca
    Before we get started

    Frequently asked questions

    What to expect from your floor repair, from the first site walk to getting back to work.

    How fast can you put an industrial floor back in service?

    DTI works to return floors to service within 24 hours on most repair scopes. The exact window depends on the system specified and the condition of the slab, which is confirmed during the site walk before any work is scheduled.

    How soon can someone look at our floor?

    DTI schedules a site walk within 48 hours of your request. You receive a written spec and schedule before work begins, so pricing follows the spec rather than the other way around.

    What kinds of industrial floor repair does DTI perform?

    Joint, crack and spall repair, epoxy and urethane cement systems, and overlays and slab restoration. DTI self-performs this work rather than subcontracting it.

    Can you repair a warehouse floor without shutting down operations?

    Yes. Repairs can be phased by zone or scheduled around production windows so the facility keeps running. The sequence is agreed in the written spec before work starts.

    What areas does DTI serve?

    DTI is based at 100 W Valpico Rd, Suite D, Tracy, CA 95376 and serves Northern California locally, with project work nationwide.

    Is DTI a licensed contractor?

    Yes. DTI holds California contractor license number 1003639. The legal entity is Diverse Technology Industrial, Inc.

    Get the floor back

    Talk to a project manager today

    (209) 879-9674

    Monday to Friday, 6 AM to 6 PM. Emergency line (209) 637-9802 after hours.